Time and cost

Time

The time needed to conduct a monitoring project is influenced by:

Time to plan project

  • Available existing data, knowledge and skills

Time needed to conduct field work

  • Area characteristics:
  • Land or water;
  • soft or hard bottom;
  • roughness;
  • steepness;
  • remoteness and extent
  • the accessibility (e.g. rough mountains with no roads, reefs with tidal differences);
  • distance from bases with facilities to study site (e.g. town to outback savannah land, boat base to reef);
  • extent of area (e.g. small park or complete state, part of a single reef or reef system).
  • Available existing data, knowledge and skills

Time needed for processing

  • available hard and software
  • experience of analysis to analyse field and image data
  • processing knowledge and skills

See example case study.