Time and cost

Actual project cost

The actual cost of a project is defined in the toolkit as the cost to run the project without the start up or general maintenance cost.

Project planning

  • Time to design and plan project
  • Organise permits
  • Logistics (transport, accommodation, food)
  • Risk assessment

Field cost

  • Travel; remote versus local; road, boat or air
  • Equipment transport;
  • Accommodation,
  • Transport to and in the field; boat, car, helicopter; driver, pilot
  • Equipment hire or purchase
  • Field team
    • Terrestrial, minum of two people
    • Marine, minimum of two people plus boat handler

Image acquisition

  • Spectral, spatial, radiometric, and temporal resolution
  • Priority capture
    • to reduce change of cloud cover
    • to acquire imagery on certain data and location

Analysis cost of field and image data

Reporting cost

See example case study.